Located in Les gets, this bathroom project was to renovate a thirty year old bathroom to a new, modern and stylish standard. The surface was quite large, but had only a double vanity unit and a bath.
The owner wanted to place a new bath unit, a shower and a toilet.

The plumbing job was a huge undertaking, and needed the floor digging up completelty to install pipes to fit a new toilet, new shower, bath, vanity unit and towel dryer.

We needed 3 weeks to dismantle, dig the floor, install new pipes for water supply and waste removal. Then the shower tray and bath were installed, with the bath moved 90 °.

Tile preparation was also huge, as it needed to be very sticky and waterproof. In a building 30-40 years old, the walls are not really flat, and it was challenging to get a very flat wall with tiles 60 x 60.

After tilling, our plumber installed taps, the vanity unit, mirror and accessories.

Then the glass partition, taylor made, to fit with the bath wall. One glass is frost for the toilet cabin.

Ceiling has been also renovated to fit spots and give more light inside, as there is no windows.

Clients are very happy with this bathroom and the transformation from the old to new.